Font
Large
Medium
Small
Night
Prev Index    Favorite Next

011. This is simply whimsical

The tone was sarcastic, which made Chen Guobin very funny, and it was rare to see Zhao Yaqin's little girl.

He coughed lightly: "This is two different things. I am not in charge of the company, so I can only make some suggestions. For specific reasons, you, the person in charge, have to solve the problem."

"How can I solve it?" Zhao Yaqin was unyielding, "You think I am Qian'er Guanyin, and can you still make money?"

"What are you doing so excited?" Chen Guobin held back the funny thing, "You have to be calm when studying the problem!"

"Who told you to speak without your back pain?" Zhao Yaqin hummed with relief, and suddenly felt that her previous performance seemed too much. She couldn't help feeling embarrassed and embarrassed: "I won't tell you!"

Chen Guobin smiled slightly and closed his mouth temporarily. In fact, she was basically the first to take the initiative to start talking...

At this time, the sun had risen a lot, almost noon. Although it was still early spring, it also accumulated a lot of heat under the continuous sunlight, which made Zhao Yaqin, who had been hiking along the streamside path for half an hour, exuded a lot of fragrant sweat and her chest also fluctuated very quickly.

Chen Guobin was carrying a small bag containing food and drink in his hand, walking behind her to prevent her from falling accidentally so that she could catch it in time.

"Yaqin, take a break." Chen Guobin thought and made suggestions in time.

"I'm not tired!" Zhao Yaqin shook her head and wanted to save face. "If you feel tired, then take a rest."

Chen Guobin became more and more funny and said lightly: "I'm a little hungry, let's eat something here first. That big stone is quite suitable for rest." His eyes fell on a protruding large stone in the rushing stream.

"Okay." Zhao Yaqin looked up at the sun, "Then let's sit down first."

The two of them then took a few steps, crossed the clear and jubilant water barrier, and sat on the stone in the middle of the stream. Chen Guobin then quickly took out mineral water, cake, milk, etc. from his bag and spread it aside.

As soon as Zhao Yaqin sat down, she felt her legs were so weak that she rubbed her quietly, and her eyes looked in the direction she was coming as if nothing had happened.

I saw that this valley was sometimes flat, sometimes falling sharply, sometimes straight, sometimes winding, sometimes winding and twisting, sandwiched between two ridges that were sometimes open and sometimes a line of sky. In addition, the water flow was particularly clear, the scenery on both sides was unprecedentedly beautiful, and the air was extremely fresh. It was indeed a very relaxing and pleasant place on earth.

Zhao Yaqin couldn't help but be intoxicated until she found that there was an extra piece of cake beside her mouth, but Chen Guobin took the initiative to hand it over: "Let's watch while eating."

Zhao Yaqin glanced blankly, reached out to take it angrily, took it angrily, and then she took it a bit hard, and said vaguely: "Thank you!"

Chen Guobin chuckled and curled his lips: "What are you doing when you say so much?"

The two of them were speechless for a while, eating and drinking, watching and thinking about something.

"How much does the first phase of the project cost?" Zhao Yaqin suddenly said nonsense.

Chen Guobin was used to her way of speaking and blurted out casually: "If you do it in the past one or two years, it will be about 200 million yuan. If time delays, you will naturally have to spend more money." After a pause, he emphasized seriously: "As long as it is possible, the sooner the better!"

"Do you think I want to drag it?" Zhao Yaqin glared, holding back the boiling inside, "How did you calculate the 200 million?"

Chen Guobin sorted out his mind, and his eyes moved from the valley to the foot of the mountain, and further away, slowly explaining: "The core of the first phase of the project is this valley, focusing on building it into a thrilling drifting base. To achieve this goal, a series of supporting facilities are also needed, all included in the first phase of the project. If it is roughly divided, it can be divided into three parts. The first part is the construction of the valley drifting base; the second part is the construction of the second-level road from Provincial Highway No. 53 to the foot of the mountain and the starting point of the upper end of the drifting; the third part is the construction of the square at the foot of the mountain and the affiliated comprehensive commercial area."

"As for the specific construction costs, I am an amateur, so I can only make a slightly more accurate calculation in highway construction, and the rest is just random speculation. If it is really done, of course, it is necessary to conduct detailed scientific arguments. For example, for highway construction, about 25 million is required to invest from Provincial Highway No. 53 to the foot of the mountain, about 12 kilometers of hilly second-level road, and about 15 million is required from the foot of the mountain, and the 4-kilometer winding road from the foot of the mountain to the upper rafting point. In this way, the construction of the second part of the road requires a total of about 40 million. As the first part of the core, the valley drifting base is estimated at 100 million. The square and commercial center of the third part are still worth tens of millions, and the scale must not be small. After all, the second and third phases of the future projects must rely on it to support the storefront."

While Chen Guobin said, he pointed his hand vividly. It was a lonely place in the wilderness. Under his description, it seemed to have become a large and vibrant tourist hotspot.

Although she already has a considerable immunity, Zhao Yaqin was still surprised by Chen Guobin's talk. Such intuitive statements allowed her, who was originally smart, to fully understand them at once, and initially clarified the planning roadmap.

However, Zhao Yaqin had no special expression on her face, and asked modestly: "What about the second and third phases of projects?"

Chen Guobin turned around and looked up at the towering mountain top direction, thinking: "The second phase of the project is mainly a mountain tourist attraction, extending from the valley base. There are about three main projects in this phase of the project. One is the two-way cable car cableway from the bottom of the mountain to the top of the mountain, which is estimated to be 50 million to 100 million; the second is to continue to extend the second-level Panshan Road from the upper end of the valley to the top of the mountain. This approximately 15-kilometer Panshan Road costs nearly 60 million; the third is the attached tourist projects, which are calculated based on tens of millions. In general, the second phase of the project is also estimated at 200 million."

"Didn't you say that there is no future in developing a forest park last time?" Zhao Yaqin frowned, "Isn't this second phase of the project just a forest park?"

"Specific analysis of specific problems." Chen Guobin looked straight and looked at it lightly. "The tourist attractions here are not isolated, they are an organic whole that is closely linked. Under the premise that the drifting base can bring huge popularity, forest parks in the same area will naturally have a future. They have a meaningful complementary relationship and can play a major role in improving each other. Moreover, spending so much investment, including infrastructure, can fully improve the tourism service system, which is very convenient, and convenience is also an extremely important tourism indicator."

After a moment of pause, he continued: "In fact, the larger the scale of a tourist attraction and the richer the content, the greater its attractiveness and the more popular it is, the higher the benefits. This is much better than scattering tourist attractions in a vast area and sparsely pulling one in the east and one in the west. Popularity is the core element of various economic issues! You must concentrate on popularity to form a real scale."

Zhao Yaqin seemed to have some insight and took a deep breath: "What about the third period?"

"Build a large tourist resort and leisure center on the mountain." Chen Guobin explained as concisely as possible: "The main service targets are rich people, you should understand what I mean."

"You might as well not say you want to build a golf course on the mountain?" Zhao Yaqin's breasts fluctuated greatly, and she was very angry: "This kind of luxurious leisure center is not hundreds of millions, so don't even think about it! The third phase of the project you mentioned totaled at least more than one billion, which is simply a whimsical idea! Can you say something practical?"

Chen Guobin shook his head and sighed: "If you want to develop well and quickly, you have to do what others dare not think about or do. In fact, among these three phases of the project, the first phase is the most difficult. As long as you can build the first phase and fully demonstrate the huge development potential here, there will never be a lack of funds for the second and third phases of the project in the future. On the contrary, there will be a lot of funds that want to invest but have no chance to invest. If you shrink this way, the 200 million yuan of the first phase of the project is at least a little practical, right? If you imagine multiple sources of 200 million yuan of funds, through fiscal appropriations, bank lending, private raising, and even listing financing, etc., it is actually just that. Many things seem impossible, but after using your mind more, it will be simple. Thinking needs to be more diversified!"

After listening, Zhao Yaqin looked at the valley and fell into deep thought and didn't speak for a long time. She was indeed very inspired this time, but she would not show any signs on her face.

"Okay, let's rest here. Let's hurry up. We have to go back early in the afternoon. I have a job." After a while, Zhao Yaqin finally stood up decisively. She actually wanted to go home quickly, record her latest thoughts, and organize them well.

“…”
Chapter completed!
Prev Index    Favorite Next