Chapter 037: Technical Disclosure
September 15th at 9:00 am
In the high-rise business conference room of the Star Hotel, Wei Zhijie organized a product exchange meeting for the Shanshui Linxi project.
There were 18 designers who came from Hangzhou yesterday, including master Dai Yongxing and senior brother Li Wei.
On the main screen of the conference room, two house plans were projected. Wei Zhijie pointed at the screen with a laser pointer and said: "This batch of orders a year ago totaled 20,000 units, including 10,000 units of large units of 136 square meters, and 9,000 units of medium units of 96 square meters.
Sets, 1,000 sets of small apartments with an area of 68 square meters.”
"The 136-square-meter large apartment involves: cabinets, shoe cabinets, sideboards, TV cabinets, wine cabinets, bookcases, master and secondary bedroom wardrobes, dressing tables, chests of drawers and balcony cabinets, involving 46 projection areas."
"The 96-square-meter medium-sized apartment has 36 projection areas, and the 68-square-meter small apartment has 30 projection areas."
After letting everyone digest the information, Wei Zhijie used the mouse to continuously zoom in and out of the drawings, allowing everyone to see through the product.
After reading for a while and feeling that everyone was familiar with the information, he continued: "Please note that this involves the difference between high-rise buildings and single-story buildings.
From the perspective of architectural knowledge, in high-rise buildings, the lower the floor, the larger the pillars. Generally, they are constructed according to five floors.
Therefore, it can be recognized as one specification for every five-story building, and the household products involved are also one specification.
Let me take apartment type A1 as an example. The cabinets on the fifth floor are 3 cm smaller than the cabinets on the sixth floor, and the cabinets on the 11th floor are 3 cm larger than the cabinets on the ninth floor.
Of course! This is not a quantitative measure. Some are five centimeters larger, and some are only one centimeter larger. This is also related to the conditions during tiling.
So! This is also the meaning of the existence of designers when it comes to batch projects, otherwise it would be enough to have dozens or hundreds of units of the same apartment type."
After everyone nodded, Wei Zhijie continued: "This time there are ten plans for the three house types, including four plans for the large house, four plans for the medium house, and two plans for the small house.
I have already deepened all the drawings in the early stage, and this time I adopted a special process structure to ensure that there is no need to cut the sealing boards on site or apply glass glue, which puts higher demands on designers.
This time I asked the master to lead the team here because I want to entrust the brothers and sisters to control the dimensions. Make sure to standardize the drawings and measure the dimensions accurately."
When Dai Yongxing saw that Wei Zhijie was well prepared, he said with a serious face to the designers present: "It's not easy for you junior brothers to have this opportunity. I thought of you right away. We didn't even do anything about the design bidding and decided directly.
.
He is under pressure, and this first phase of the project is directly all-inclusive design, so I hope you will face this matter with ruthlessness and tenacity. You all understand!"
"Yes! Master!"
The designers present responded in unison.
After Dai Yongxing finished speaking, he signaled Wei Zhijie to continue. Wei Zhijie nodded and said: "This product has a total projection area of 832,000, and the winning bid amount is 732.16 million!" According to industry standards, the lead designer gets a 1% design commission.
Therefore, for the project at the end of the year, the designer’s commission is 7.3216 million, which is equivalent to 8.8 yuan per projection area.
Counting the 46 projections of the large apartment, the painting fee is 404 yuan. The price is neither high nor low. There are five plans in the ten apartment types, so there are exactly three senior brothers and sisters responsible for each apartment type.
In terms of time, 20,000 units require 40 chief designers and 80 design assistants for surveying and drawing. Currently, excluding the masters, senior brothers and Sister Hui who does soft furnishings, there are still 25 chief designers missing. As for how to arrange the personnel
, listen to senior brother."
Li Wei nodded and said: "Chief designer, I think it's enough to add 10 more people. Zhijie, you have already drawn all the drawings clearly in the early stage. The most important thing now is to measure the room, modify the dimensions, and draw a detailed list.
, as long as you are careful, even an assistant designer can do the job.
In the past few years, the studio has trained many designers. I will summon them after the meeting. As for the designer assistants, it is even easier. I will inform your third senior brother and mobilize 200 students from the third phase of his design school.
.hey-hey!"
Wei Zhijie nodded. It was originally part of his plan to recruit students from the Eya Design Academy owned by his third senior brother Li Zhiming.
But when he heard his senior brother chuckle, Wei Zhijie felt helpless, and still took the shot and said: "Students can be stationed as formal design assistants, but they have to work!"
Li Wei laughed loudly: "Of course, I am not Zhou Papiha, but I can't give too much. They are about to graduate. If such a super project can be used as a graduation internship, I guess they will come crying."
Seeing everyone's expressions of deep understanding, Wei Zhijie was helpless.
Li Wei actually said it well. If you can participate in such a super project during your internship, and be led by the chief designer, and get some guidance, it will definitely be worth a thousand dollars.
When you graduate, as long as you fill in your project experience, it will definitely be a shining resume.
Dai Yongxing understood Wei Zhijie's concerns very well. After all, the project could not tolerate mistakes. He cleared his throat and said seriously: "As for the labor services of the design assistant, we will discuss it later. It is best to wait until Zhiming arrives before asking for his opinion."
With his master Dai Yongxing taking action, Wei Zhijie felt at ease.
Next, the conference room began to conduct in-depth explanations and discussions on the various structures of the product and design specifications. It is important that all lead designers have a thorough understanding of the apartment types they are responsible for.
This morning's meeting ended at 12 noon.
After lunch, everyone took a lunch break.
At 14:00 in the afternoon, Wei Zhijie took a dozen senior brothers and sisters to the construction site. They first visited the model room and studied the actual product inside and out.
Then I went to the construction site that was being renovated and looked at the rough-out apartments, the apartments under construction and the completed apartments.
In addition, on-site inspections were carried out for high-rise buildings with specifications for every five floors.
Understand the various precautions and design points for avoiding beams and columns.
Dai Yongxing and Li Wei looked at Wei Zhijie with complicated expressions throughout the process, marveling at his ability to coordinate the legion's operations, his meticulous attention to detail, and his ability to control events.
It is really unreasonable for such people to fail.
It is said that success is inevitable, and inevitable success requires certain conditions, and Wei Zhijie himself is the most important condition for inevitable success.
In the evening, after a busy day, we still had dinner by the Cangjiang Reservoir.
After the meal, the senior brothers and sisters began to show off their talents in twos and threes. For designers who have many skills but are not overwhelmed, they cannot be considered designers if they do not know several musical instruments or special skills.
As the stars rose, more than a dozen people sang and danced beside the reservoir.
Dai Yongxing and Wei Zhijie walked alone by the reservoir, and the two communicated in more detail about Wei Zhijie's next plan.
The installation masters began their week-long tour of Qiong Province.
Chapter completed!