Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 051: Project Vientiane

There are 16 lines in the material cutting process of the factory.

Among them, there are 4 rear-loading heavy-duty electronic saws, 4 front-loading medium-sized electronic saws, 7 heavy-duty sliding table saws, c.

Among so many pieces of equipment, it is easiest for a master to operate a heavy-duty rear-loading electronic saw.

As a cutting equipment with a rear automatic loading and lifting platform, all the heavy-duty electronic saw needs to do is program it and press the button.

Then, with the help of pneumatic floating beads, the panels can be cut and turned over.

Compared with manual sliding table saws, heavy-duty electronic saws can be formed in one go. After nearly five minutes of flipping and cutting, four large boards can be directly cut into parts of several specifications.

What a small worker with a heavy-duty electronic saw has to do is lift the cut parts onto the pallet of the drum line. The work is much easier than a small worker with a sliding table saw.

If a small worker with a sliding table saw still needs skills, then a small worker with an electronic saw is simply a porter.

Because it is relatively easy to drive a heavy-duty electronic saw, the unit price will be less.

1.1 yuan per square meter.

The heavy-duty rear-loading electronic saw can cut 550 large boards in ten hours per shift by stacking 4 large boards.

550*2.97=1633.5 square meters

1633.5*1.1=1796.85 yuan

Of this 1,796.85 yuan, since the laborer is only equivalent to a porter, as long as he is physically strong, he only needs to pay about 4,500 yuan per month.

After dividing 150 yuan, the heavy-duty electronic saw master can get about 1,650 yuan per day.

Calculated based on full attendance, 1650*30=49500 yuan.

This is a terrible amount, which is why the masters who have worked in the original company for ten years still want to earn this amount of money first.

In the original enterprise, this income would have dropped by 4 times.

Next up is the medium-sized front-loading electronic saw.

The difference between medium-sized front-loading electronic saws and heavy-duty rear-loading electronic saws is that they cannot automatically load materials, and the loading method is similar to that of heavy-duty sliding table saws.

Materials are also loaded from the pneumatic lift on one side.

However, the operating table of the medium-sized front-loading electronic saw also has the assistance of floating beads. Four pieces can be pushed together when loading, which is much easier than loading with a sliding table saw.

In terms of cutting, medium-sized electronic saws are almost the same as heavy-duty electronic saws, but loading is more troublesome.

It also takes more time and is less efficient than a heavy-duty electronic saw. It can cut about 500 large boards a day in a superimposed manner.

Therefore, the labor price of a medium-sized electronic saw is 1.2 yuan per square meter.

The income is similar to that of a heavy-duty electronic saw.

c electronic cutting saw, this machine is actually not suitable for use as a cutting machine for project orders.

c There is no way to stack cutting materials, and only one large board can be processed at a time.

Its operating principle is to fix a large board on the operating table through vacuum suction, and then use the washing knife above to wash out the desired shape.

This kind of machinery is mostly used in making shaped blister doors and painted doors.

It is used in engineering orders, and its only advantage is that it can produce various special-shaped parts.

For example, arc boards, corner boards, boards with round holes, especially for stove cabinets, the fixed board above the front needs to have 5 breathable mesh holes.

Processing with this equipment is much less troublesome than manually drilling holes in the gong.

Its labor price is 1.3 yuan per square meter, plus a processing fee of 2 yuan for each special-shaped component.

Even if the part is very small, there is still a processing fee of 2 yuan.

In theory, the masters of C can only open 80 large boards for ten hours per shift.

There are about 800 parts. Their area pricing income is low, but the special-shaped fee income is quite high.

80*2.97=237.6 square meters.

237.6*1.3=308.88 yuan.

800*2=1600 yuan.

1600308.88=1908.88 yuan

Compared with heavy-duty electronic saws and medium-sized electronic saws, the profit of c is not low.

To operate this equipment, you also need to know how to write data, which not everyone can do.

Finally, the heavy-duty sliding table saw relies on the craftsmanship of the master, and the processing fee is 1.5 yuan per square meter.

At this point, the project has actually entered the mid-term stage.

The early stage is to implement the model room, follow up the review of the model room, and sign the order contract.

Then according to the contract content, the total number of materials is broken down, a material supply chain is created, and the materials are purchased and returned to the factory.

Batch mapping of house types began on site, and product drawings were drawn that conformed to the actual size of the site.

Implement product manufacturing, whether it is self-made, outsourced, or OEM.

At this point, the early stage is over.

An important sign of entering the mid-term stage is the start of product production, followed by the preparation of the fleet to transport the products to the construction site.

Organize manpower to start the installation, ensure the installation progress, and conduct overall acceptance until the first batch of installations are completed.

This process lasts relatively long.

The sign of entering the later stage is that the main body of the product has stopped producing, and at most only some sporadic replacement parts are produced.

After that, it entered the continuous closing stage, with more than 70% product acceptance and 90% balance recovery.

Finally enter the closing period and after-sales service period.

In the contract stipulations of the project, 3% of the amount is generally reserved as the one-year warranty period.

This stage is the period when the project party continues to hand over houses, and various after-sales services will occur during this period.

When the project party requires the product party to come over for after-sales service, but the product party does not provide timely after-sales service, the project party will use the remaining 3% of funds to hire after-sales personnel to provide services.

After one year, you will pay whatever is left.

If it's not enough, you may have to ask the product side for payment. But this rarely happens.

The sight returns to the Shanshui Linxi Project and the Military Supplies Warehouse.

September 14th to present.

The installation masters mobilized from hundreds of cities returned to the military supply warehouse at two o'clock in the afternoon after traveling to Qiong Province for more than a week.

The mental outlook of every master has been greatly improved.

As Wei Zhijie, who has a meticulous work schedule, why did he arrange for the installation masters to Cangjiang a week in advance? And arranged for them to travel to Qiong Province for seven days.

It’s not just a waste of money, it’s because in actual work, when these installation masters are mobilized, many of them work in franchise stores of major brands.

Many orders are still in after-sales status, or some minor problems may still occur after installation.

If it is not completed seven days in advance, if the masters are invited to come to the project and start working immediately, they will receive many after-sales calls during the process.

This will not only affect the installation progress of the installation masters, but also affect the efficiency and installation effect. Therefore, the installation masters were brought to Qiong Province one week in advance.

After a week of travel, all the business in Baishi, whether it was entrusted to others or left to the apprentices left by the masters, has basically been completed.

After that, you can travel lightly.

After returning to the military supply warehouse, Zhao Jingwen immediately arranged dormitories for the installation masters and ensured logistical supplies.

Then, in the tool warehouse, each installation master is equipped with a full set of installation tools.

Electric tools include: electric hand drills, impact drills, jigsaws, angle grinders, air pumps, and air gun nails.

Auxiliary tools include: tape measure, square, hammer, pliers, awl, screwdriver.

Consumable materials include: pencils, bits, blades, saw blades, gun nails, grinding wheels, woodworking saw blades, sandpaper, etc.

The electrical tools purchased this time were all imported from Germany. The entire set of tools cost nearly 10,000 yuan, and 300 sets of tools were purchased at one time.

For a whole afternoon, 98 installation masters checked in and collected their tools.

According to plan, the first batch of products will be shipped to the project in two days.

At that time, for Chen Weikang, whether he can carry a happy little widow home at the end of the year depends on the installation revenue in the past few months.
Chapter completed!
Prev Index    Favorite Next