Chapter 609 Inspecting the Humen Bridge and Shatoujiao Power Plant!
Chapter 609 Inspection of Humen Bridge and Shatoujiao Power Plant!
Yang Ming inspected the Yangcheng section of the highway from Yangcheng to Pengcheng for most of the day.
Back to Oriental Hotel.
That night.
Yang Ming learned that President Xia of the Xiangjiang Jockey Club has already talked with relevant persons in charge of Guangdong Province and Yangcheng to pilot horse racing in Yangcheng.
The Xiangjiang Jockey Club provides funds, technology, talents, relevant systems, and land provided by Guangdong Province and Yangcheng, some personnel, including training personnel.
This is preliminary cooperation negotiation.
Eventually, it may take some time for both parties to negotiate.
Even so, President Xia and others were still very happy.
On the other hand, Huang Yaonan and Mou Shili also discussed cooperation with the transportation departments of Guangdong Province and Yangcheng respectively. Both parties were very interested in the cooperation between Xiangjiang Bus Group, Xiangjiang Underground Railway Company, Yangcheng, and even the opening of bus routes, bus routes, and Yangcheng's first subway construction.
These also require both parties to spend time talking about them.
Yang Ming and others took a bus to leave here.
In order to solve the power consumption problems in Pengcheng and Guangdong Province, it was decided to build a power plant around Yangcheng and Pengcheng, and actively absorb foreign investment to build it.
Yang Ming and others left Yangcheng District, passed through the suburbs, and entered Wancheng.
Then why is there no cross-sea bridge built on Victoria Port in Xiangjiang? In Yang Ming's view, in addition to affecting shipping, it will also affect the beauty of Victoria Port.
Shajiao Power Plant is located in Humen Town, Wancheng, Guangdong Province, and is close to Humen Bay at the mouth of the Pearl River. It is located between Yangcheng, the three megacities with the most concentrated electricity load in Guangdong Province, between Pengcheng and Guancheng, so it is a power plant with a power grid support role.
Yang Ming has seen that Yangcheng appeared in 1980 and Yangcheng, which was very different from that of the first time he returned.
I used to pass by here, but I could only take a ferry.
Yangcheng is changing.
Yang Ming and others finished breakfast.
Historically, this Shatoujiao Power Station was invested by Hu Yingxiang's Asian Power Company. Its main power is provided to Dongguancheng and Guangdong Province for use.
It's different here.
The width here is twice as wide as the narrowest place in Victoria Harbour.
Shajiao C Power Plant was built in cooperation with Guangdong Province and Xiangjiang Hehe Industrial Co., Ltd., and adopts a financing method similar to Factory B. Guangdong Province has a controlling position and is responsible for operation. The cooperation period is 20 years.
He has seen many workers here.
In addition to the provinces and cities in China, there are also foreign buyers, which are very lively.
"Not bad, but I have to go to Wancheng, Pengcheng and other places to take a look."
It was only since the construction of the Hung Hom Tunnel that we could pass through the Hung Hom Tunnel.
Historically, it was invested and built by Hu Yingxiang's company established in the country.
However, compared to the future, there may not be so much investment now.
In Yang Ming's opinion, a lot of time wasted.
There are already many foreign-funded companies in Guancheng.
In addition to many industries under the Empire Group, which have been transferred to Guancheng, Yang Ming’s father’s Honghui electric fan company has also been transferred to Pengcheng and Guancheng. The labor wages here are lower and the scale is expanding many times.
In this case, Honghui Electric Fan Company has a much higher order, and its revenue and profits have also been much higher.
Now President Xia, Huang Yaonan, Mou Shili and others are still staying.
In this regard, just like when Xiangjiang passed through Kowloon opposite him, you can only take a ferry.
Now, the Humen Bridge, built by Yang Ming in the name of the Imperial Group Country Development Company, has been launched since the project was established last year and has begun to carry out various preliminary work.
...
Historically, the Humen Bridge started construction on October 28, 1992; it was completed and opened to traffic on June 9, 1997; and passed the completion acceptance on April 20, 1999.
From beginning to end, Victoria Harbor only built an undersea tunnel, but not a cross-sea bridge.
The year after the start of construction in Factory A, Factory B also began formal construction.
Now, Guancheng has begun to enter a state of large-scale development, with many industrial chains transferred from overseas.
It is really difficult to build a bridge, much higher than building a highway.
"Mr. Yang, are you really leaving Yangcheng so soon?" Secretary Li asked.
Yang Ming stood here and looked at the wide Pearl River in the distance. What does it feel like?
Early the next morning.
Yang Ming came to the vicinity of the construction of Humen Bridge.
Humen Bridge starts from the Taiping Interchange in the east, crosses the entrance of the Shiziyang Ocean, and reaches the Nansha Interchange in the west. The line is 15.76 kilometers long and the main bridge is 4.6 kilometers long. The bridge deck is a two-way six-lane expressway with a design speed of 120 kilometers per hour. The total investment of the project is RMB 3.02 billion.
It is not as good as the Imperial Group now, with enough funds to invest.
In the afternoon, Yang Ming and others took a bus to Humen Shajiao A Power Station for inspection.
The reason why Hu Yingxiang’s cooperation with Guangdong Province is like this.
Even if the Empire Group has built an undersea tunnel, it is not suitable to use it here.
In 1984, the Shajiao A Power Plant, wholly owned by Guangdong Province, was the first to start construction, installing three 200,000 kilowatt domestic generator sets. On April 21, 1987, the first unit was put into production and power generation, and all of them were completed in 1989.
Pack up your stuff.
The Humen Bridge, which is more than four or five kilometers long and wide, cannot be built without sufficient technology and funds.
In the 1980s, when opening up was implemented, Pengcheng was classified as a special economic zone and the economy developed rapidly.
Oriental Hotel, and even the traffic in the city is still very high.
Yang Ming just looked here, but he didn't stop.
At this time, it was still in the Canton Fair.
It is because Hu Yingxiang himself did not come from operating electricity. Historically, the investments of the Asian power companies and Guangdong Province that Hu Yingxiang invested were somewhat complicated.
Leave near Humen Bridge and head to a restaurant in Guancheng for lunch.
"Boss, this is the Humen Bridge?" Lin Xiuzhi asked.
The place where Yang Ming is going to see now is the place where the Humen Bridge is built.
Historically, Hu Yingxiang proposed to build the Humen Bridge very early, and Hu Yingxiang's strength was also limited, and there was not that much funding.
Historically, Humen Bridge is a cross-sea bridge in Guangdong Province connecting Nansha District, Yangcheng City and Humen Town, Guancheng City. It is located above the Lion Ocean of the Pearl River and is part of the southern connecting line of the Pearl River Delta Region Ring Expressway.
Yang Ming is preparing to leave Yangcheng tomorrow, and President Xia, Huang Yaonan, Mou Shili and others will continue to stay in the provincial capital to talk.
"Yes, it's just here. But it will take several years to build it."
Yang Ming has met Mr. Ren, Mr. Liang and others several times and has also talked about it. Both parties are very satisfied with further investment and cooperation.
Shajiao B Power Plant is the first engineering project to be built using the "construction-operation-transfer" (BOT) method. It is owned by Pengcheng Holdings and Xiangjiang Hehe Industrial Co., Ltd., but Pengcheng is only responsible for providing land and operational fuel, and the construction funds for the power plant are raised by the Hong Kong side.
Many industries under the Imperial Group have also been transferred in.
Yang Ming had breakfast at the Oriental Hotel, and Secretary Li had come over. He had learned that Mr. Yang and others left Yangcheng today to continue inspecting his investment industry.
After demonstration and investment, it was finally decided that Guangdong Province and Pengcheng would contribute separately to build a power plant next to Shajiao Beach near Humen, and form two systems at the same time.
In June 1981, Guangdong Highway Construction Company and Xiangjiang Hehe Z Country Development Co., Ltd. jointly signed a letter of intent for Hejian Humen Bridge Expressway.
The power plant implements a management system of China-style, adopts the technology and equipment provided by Dongyang enterprises, and is supervised by Dongyang enterprises. The first unit of Factory B was put into production on April 22, 1987, and the second unit was put into production three months later.
The Empire Group has funds, skills, talents, and engineers, and these are not problems.
For Hu Yingxiang, he actually did not lose, but he didn't make a lot of money.
The power plant we are investing now is wholly owned by Xiangjiang Electric Lighting Company, which was acquired by Imperial Group.
Whether it is now or in the future, the construction of the Humen Bridge is also a very large project.
It was proposed very early, but it only started construction in 1992.
Had lunch at that restaurant.
Xiangjiang Electric Lighting Company has very mature technology, management, etc. in power plants, but it just copied the Xiangjiang system to various parts of Guangdong Province.
Now there are not only investments in Shajiao Power Station, but also in several cities in the Pearl River Delta, and even in Shencheng and Yanjing.
Chapter 4!
Please subscribe!!
Chapter completed!