Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 515 Environmental Protection Construction

"The land cleaning and leveling work has been completed. We are currently excavating the foundation of the dome and the foundation of the urban building planning part." In a conference room at the construction site, the engineer is introducing the construction progress of the project to Chen Xin.

Excavation of building foundations is the top priority of the entire construction project, and it is not an exaggeration to regard it as the most important part in a sense.

The foundation of "a building that rises from a height of ten thousand feet high" is the foundation that determines whether the building is solid and durable.

If the foundation of a building cannot be laid well, then even if the building is well built, it will be a paper house that can be knocked down with just one push.

This does not need to be emphasized deliberately for Yanguo, a major infrastructure country. Yanguo's engineering team does not need to remind him to complete the construction according to the requirements of the project.

"Well, I've seen this just now. It seems that you've done a good job." Chen Xin had a smile on his face, as if he was very satisfied with the construction progress of the engineering team.

Hearing Chen Xin say this, the engineer immediately smiled. Although Chen Xin is not his superior, it is obvious that Chen Xin's recognition is still something to be happy about in his opinion.

However, Chen Xin also asked the engineer while praising him: "Did you excavate the building foundation first and then build other supporting facilities?"

This is what Chen Xin was curious about when he inspected the construction site just now. The workers were digging the foundation, and it was very deep, but they were basically limited to the scope of the construction building planned on the design drawings.

However, some of the land outside this has only been leveled and no excavation has been carried out.

However, according to the design drawings, various supporting facilities will also be built on non-building parts of the land, so Chen Xin has this question.

After all, this is a whole city, and it is impossible to build only houses. Supporting facilities such as sewer channels, drainage pipes, heating pipelines, etc. will also be laid, not to mention city-level power supply lines and dome lighting systems.

In the future, in this dome city, lighting will rely on lighting to simulate light changes and artificially create the difference between day and night.

"Yes, according to the construction plan, the progress of this phase is mainly to excavate the building foundation. As for the supporting facilities, according to the construction plan, construction will be carried out after the foundation is completed." The engineer explained to Chen Xin that although Chen Xin is not his boss, Chen Xin's identity is undoubtedly more important than his boss, and any questions he has to answer for him.

After listening to the engineer's explanation, Chen Xin had no special opinions or opinions. He did not understand engineering construction, and he only asked what he didn't understand.

However, after the engineer explained, Chen Xin nodded pretentiously and did not ask any more questions.

A designer on the side took the initiative to speak and said to Chen Xin: "This is mainly caused by the special circumstances of the dome city. According to our plan, we will first complete the construction of the heating energy tower and the dome, and then increase the temperature under the dome, and restore the temperature of the entire construction environment to above zero degrees. This can greatly reduce the construction difficulty and allow the original construction machinery to play a role."

Chen Xin could understand this point. Most of the original construction machinery used diesel, and when the diesel reached an environment of tens of degrees below zero, even high-grade diesel could easily condense, causing the diesel engine to be unable to start.

Not to mention that these construction machinery themselves are very rough designs, and the cab does not have wind-proof and cold-proof designs. Even if the driver has protective clothing in this kind of weather, the joystick will freeze.

However, if dome insulation can increase the temperature of the construction site under the dome to above zero, these construction machinery that were originally unusable can naturally come in handy.

After all, even with the help of engineering Titans, excavation on frozen soil and excavation on ordinary soil are two completely different difficulties.

Therefore, when formulating the construction plan, some people proposed to complete the dome and the energy tower first, so that the energy tower can obtain electricity to ensure the construction site construction, and the temperature of the entire construction site can be warmed up by the dome insulation, allowing the permafrost to melt and reduce the difficulty of construction.

"This point has been confirmed before, so I'm not worried." Chen Xin nodded and said another thing: "Dome City is an ecological city, and the ecological environment is the most important for this city, so I hope you can also pay attention to this issue during the construction process."

Chen Xin cannot help but emphasize this issue. Dome city emphasizes its important role in rebuilding ecology in design. Therefore, all parts of the entire city are built around the core of green ecology.

Not only are the city covered with various green plants, but the design of a series of supporting facilities such as water circulation and garbage disposal in the city adopts the most environmentally friendly design, so as to enable the city to create the most perfect ecological environment in the future.

Construction itself is the most ecologically damaging. Even if you pay attention to it during the construction process, this will still have more or less impact.

Chen Xin’s reminder also hopes to minimize its impact on the ecology during the construction process.

Even though there is no ecology on the construction site of the dome city now, after the dome is built, this is a problem that must be faced. If you are not prepared now, it will be a big problem if there is really something wrong in the future.

Both engineers and designers have long remembered this issue, and they also paid great attention to this during the previous construction process.

Now Chen Xin mentioned it again, and both of them nodded at the same time and said, "Please rest assured that we will not be careless about ecological issues."

While making guarantees to Chen Xin, the engineers also emphasized their efforts during the construction process: "We are strictly following the construction requirements during the construction process, and the protection of the environment and ecology has been implemented on everyone from the beginning.

All workers have received relevant education and relevant responsibilities have been clearly stated. We will do everything we can to ensure that the entire construction is foolproof.

For the impact on the ecological environment during construction, the recoverable parts will be restored after the construction is completed, and the unrecoverable parts will also minimize the damage as much as possible to ensure that the impact on the ecological and environmental aspects during construction is minimized."

"I'll be relieved when I hear you say this." Chen Xin's smile even more when he heard the engineer say this.

Since he has decided to live here later, Chen Xin certainly hopes that his new home will have a better environment in the future.
Chapter completed!
Prev Index    Favorite Next