Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 130 Tower Crane!

There are also a small number of people who even made small plans, and these are leading cadres built by one, two, four, five, etc.

Zhang Ziqiang wiped the sweat from the earthen wall, pointed to the huge tower crane lifting arm, and said to everyone: "This is a good thing! This construction is over, remember to move it back!"

The cadres next to him also smiled excitedly: "You are the foresighted. Those who follow General Manager He are all from our Yijian! For others, others don't know how to use it!"

On the other hand, Li Zhijun had the same idea, rubbed his hands at the tower crane and whispered something to the people around him.

After the installation of the first tower crane, He Ku felt a little relieved. There was no large crane involved. The installation work was very difficult. The lifting arm and balance arm were all tens of meters long steel and iron bones. They were carried up completely by several small cranes and the shoulders of many workers, aiming at the interface bit by bit, and pieced together bit by bit.

After the debugging is completed, why should I directly select the tower crane driver on the spot. Those who are willing to sign up are not afraid of heights or those who are educated, why should I teach step by step?

The remaining installation work is simple. The climbing frame is larger than the ordinary section. You can climb it by yourself, just increase it step by step.

Let the workers take a moment of rest, so why take the prepared tower crane driver to start demonstrating how to use the tower crane.

The hydraulic tops on both sides of the climbing frame quickly lift the tower, and then the second 2.5-meter standard section no longer requires manpower, but is directly lifted by the tower crane.

The workers standing on the tower crane immediately installed the second standard section, which saved a lot of effort this time, followed by the third and fourth ones.

Since the construction height has not yet been reached, why not stop here, that is, the height of ten meters.

The installation of the second tower crane is much simpler. After the measurement was completed, the surveyor processed at a higher level position after the measurement was completed. Because the four underground bolts are surrounded by steel plates, the higher position only requires a little polishing of the steel plate.

Then, while demonstrating on the crane tower, he taught technology to the new tower crane driver.

A 2.5-meter standard section was lifted, and the first tower crane slowly rotated in the air, slowly placed the standard section on the base of the second tower crane.

The workers guarding here quickly aimed at the anchor bolts and tightened them up.

Then, why slowly lift the climbing frame, rotate, rotate the tower body, driver's room, balance arm, A-frame assembly, and lifting arm. This time, there was no use of so much manpower at all. Only a few people needed to correct the position and install it according to the standards for the installation of the first set of hanging towers.

Soon, the second set of tower cranes was installed. Before installing the third set, why did you get off the tower crane and shouted the nine tower crane drivers who had just been selected to give a lecture, and handed over the heavy task of opening the tower crane.

It is actually not difficult to open this thing. Many people in later generations can get started by simply training. Why bother with this? Anyway, the level of the early stage is not high, so let everyone learn little by little and try it.

Holding three books, He Ku stood in front of the nine people and said aloud: "This thing will be officially handed over to you in the future. Now you need a tower captain. Whoever you can answer my question first will be the one I will be the one I will be the one I will be the one I will be!

In the expectant eyes of the nine people, why ask: "Open this tower crane! What is the most important thing!"

The nine people looked at each other. What they said just now is very important. They are all the key points of driving a tower crane. But what is the most important?

Twenty seconds later, someone suddenly said quickly, "Safe! Safe! Safe!"

He Ku looked at the man with great satisfaction, "Very good, what's your name?"

The young man took a step forward and said excitedly: "Report to the leader, my name is Li Jianxin, I am 23 years old this year, and I belong to the First Construction Company!"

He Ku nodded, walked to Li Jianxin, put three books in his hands, and instructed: "Okay, you come to be the captain, three people in groups, these three books are for you, and you will put them on three tower cranes to do middle school! But the most important thing is safety! Don't be afraid of slowness, but you must be stable and safe!"

"Don't worry, leader, ensure the production tasks are completed safely!" Li Jianxin responded loudly.

Then, He Ku took out nine tower crane driver work certificates and put the 001-number certificate on Li Jianxin. In order to prevent anyone from damaging, only those who have these certificates can get on the tower crane.

"I have something else, you guys think about it yourself." After saying that, He Ku left here and went around other places.

After leaving, Li Jianxin looked at the other eight teammates excitedly, "We are the first tower crane drivers of the flower farm! Are you happy?"

"Happy!"

"Happy!"

Li Jianxin simply held a small meeting, divided it into three groups of people, and began to direct the installation of the tower crane. As the captain, Li Jianxin gave up the opportunity to get on the tower crane to the other eight people, and left it alone on the ground, watching, learning, and commanding workers to install the third tower crane.

Soon after, four-fifths of the workers who installed the tower crane were transferred by He Ku, and the remaining people were left to install the third tower crane.

Jiefang Automobile pulled pebbles from carriages, and the cranes from the steel rolling mills were lifted out of the railway. Why did you take everyone and directly build the railway to the metallurgical area of ​​the steel rolling mills?

At noon, Sha Zhu and Nan Yi were preparing lunch at the steel rolling mill. Both of them had the experience of a 10,000-person meal, so they would not lose their chains.

However, because the people who went to the factory to eat twice the number, the seats in the cafeteria were unprecedentedly tight, Director Yang had to change them to eat in batches.

At three o'clock in the afternoon, the railway was only 500 meters away from connecting to the steel-rolling mill's steelmaking workshop.

He Ku did not continue to stay here, but came to the metallurgical area alone and found the workshop directors who were discussing how to build the internal pig iron castings of the blast furnace and the external steel plates.

The steel output of steel rolling mills can fully support these castings, and it does not take long to take. The focus of everyone discusses the size of the castings and transportation issues. In their eyes, carefulness is the most difficult.

When everyone was discussing it hot, He Ku walked in directly and said that all the castings of the first blast furnace will be manufactured in seven days.

Although seven days sounds rare, this is also a result of calculations. The pouring of the main shell of the blast furnace and the inner shell of the pig iron is not time-consuming. These technical difficulties can be overcome by the steel rolling mills. The real difficulty is the installation and construction of the blast furnace supporting system, the loading system, the loading system, the air supply system, the cooling system, the hydraulic system, the gas recycling and dust removal system, the blowing system, the power system, etc., which are both time-consuming and technically difficult.

But even so, it will take care of it within three months.

Accompanied by the workshop director, He Ku glanced at the steel that had just been released, pointed at them and asked, "Is the steel used in the b550 furnace shell a furnace? "

"Yes, after the treatment outside the furnace, we plan to cast the parts and it will be poured soon!" The workshop director said carefully.

He Ku shook his head, "Don't pour it first. After processing, put it in a torpedo can to keep it warm. Take people to prepare the mold and pour it there, so that you don't need to consider the size. Prepare all the materials immediately and start pouring the entire body according to different parts of the blast furnace as soon as possible. There is no problem with three 240-ton tower cranes and 500-ton castings, and you don't need to consider the installation issues."

"General Manager He, how do we transport it? The torpedo cans are pulled by train, and there are no rails!" asked another workshop director.
Chapter completed!
Prev Index    Favorite Next