Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 78 Tianshui Water Affairs

The integration of United Water Affairs in Tianshui has been initially completed. The Economic Supervision Office, which is responsible for internal reform, left the resident group and rushed to the next local water affairs company.

The general manager of Tianshui Water Company was transferred from Chang'an headquarters after inspection.

In the reform of United Water Affairs, a very important condition is that the management of United Water Affairs will completely remove the official hat.

This restriction is actually to reduce the politician-style management. He serves in United Water, no longer has a system-based staffing and does not even have a professional staffing, but is a pure corporate management.

This condition has also caused a large number of people to be very confused.

Because joining United Water Affairs means that there will be very high restrictions in the future and you cannot transfer to other state-owned enterprises or official institutions, and they can only be considered managers.

In the initial cooperation, Huang Xiuyuan made this clear, that is, the state-owned enterprise style that completely cuts off the ties.

If they do not do this, the management of the water company still has a business position, and they often consider how to be promoted, maintain stability, and maintain their positions.

For this reason, the former head of Tianshui's water company refused to join United Water Affairs and transferred back to work at the Water Conservancy Bureau.

Yang Zhiye, who took over Tianshui Water Affairs, was a former section chief of Chang'an Water Affairs, who had been in the system for almost twenty years.

This time, because of his clean foundation, he was dispatched to be responsible for Tianshui Water Affairs and served as the general manager of Tianshui Water Affairs Company.

After taking over the related work, the previous tap water office building was changed to United Water Affairs Tianshui Branch.

Inside the general manager's office.

Yang Zhiye, the head of two water plants, the heads of various departments, and the head of the supervision group, is in a meeting.

"After the initial reform, everyone may not be able to adapt, but I will first understand the basics. If the company can make a profit, everyone's benefits will inevitably be. If anyone still retains his previous little thoughts, Team Leader Li and I will not show mercy."

At the beginning, Yang Zhiye gave everyone a warning.

"The staff of Tianshui Water Affairs are still too bloated, so everyone should be mentally prepared."

Wu Hongbing, who was in charge of personnel, asked hesitantly: "Mr. Yang, don't you know how many people you want to lay off?"

"The total number of employees is 861, and according to the plan, it will be reduced to about 400 in the next three years."

"What?"

"so much……"

"Isn't that good?"

Yang Zhiye's tone was plain: "Compressing personnel is not about laying off employees, but about diversion to other companies. However, I am ugly in front of me. If I explain those small actions in the past clearly to the people below, if they appear again, I will put them on the bed and leave."

"clear."

"I must give orders."

The department heads and factory directors breathed a sigh of relief. As long as they were not fired, it was not too serious.

Li Mingchu, who was standing by, kept silent and only kept notes on some of the conversations because they would not interfere with specific operations unless there were serious problems in management decisions.

Yang Zhiye opened the map of Tianshui and pointed to Qinzhou District in the city and Maiji District next door:

"At present, Qinzhou Water Plant and Maiji Water Plant have shown obvious water supply shortage. There was a water shortage last summer. It is estimated that with the growth of population and industrial and agricultural production, the water supply pressure in Tianshui will become increasingly large in the future."

Han Zhonghua, director of Qinzhou Waterworks, nodded: "That's true. The infrastructure of the two old factories was built in the 1980s and 1990s. It is currently facing pipeline aging and insufficient water storage in the reservoir area."

Yang Zhiye immediately said:

"So it is necessary to be prepared. First, prepare to build a sewage treatment plant, treat wastewater and sewage, and recirculate the sewage back into the reservoir."

"Second, we will start to promote pollutant discharge contracting projects to various enterprises, help them realize internal circulation of water and reduce the proportion of industrial water."

"Third, after the internal circulation of sewage treatment plants and industrial water is completed, the water supply pipeline will be comprehensively upgraded and the groundwater mining will be gradually and orderly reduced."

"Fourth, establish strategic reservoirs, build covers of strategic reservoirs, reduce the evaporation of inventory water and pollution from sandstorms."

These work will be carried out step by step. Yang Zhiye has calculated some of the situations of Tianshui Water Affairs. Last year, Tianshui's total water supply was 36 million cubic meters. For a region with a total population of 3.45 million, the per capita water supply per capita is only 11 cubic meters per year.

If industrial and agricultural water is subtracted, the per capita water supply per year is estimated to be around 6 to 7 cubic meters.

For the average per capita per capita in the south every year, there is not even a fraction of the per capita in the northwest cities.

It’s not that the people don’t want to use it, nor that the people can’t afford it, but that the local water resources cannot be supplied.

If calculated based on the potential of 100 cubic meters per capita per year, Tianshui's water supply consumption potential will be at least 345 million cubic meters.

According to the current price, calculated at 2.6 yuan per cubic cube of water, the annual sales can reach about 900 million yuan. In addition to the charges for industrial and agricultural use, 1.2 billion yuan will be charged each year, which is very conservative.

Therefore, it is very necessary to promote the internal circulation of sewage treatment plants and industrial water.

Yang Zhiye arranged various tasks and began to prepare to find a place to build a sewage treatment plant and strategic reserve reservoir. At the same time, he prepared to cooperate with Blue Times to hand over the filtered pollutants to Blue Times for treatment.

January 18.

Tianshui, Qinzhou Water Plant.

Yang Zhiye and Han Zhonghua checked the situation of the tap water plant. The newly renovated tap water water purification equipment and trace element addition equipment are under trial operation.

Qinzhou Water Plant is the first water plant under United Water Affairs to carry out water purification transformation. There are only three places in total, all of which are used in cities with worrying water quality.

Yang Zhiye looked at the water purification situation: "China, you must do your job well. The sewage treatment plant will not be able to complete it for a while, and it will not be put into use until at least the second half of this year."

“I will cooperate with the company.”

Since the sewage treatment plant is still under construction, the water company has chosen a stopgap measure, which is to connect nearby sewage pipes to the water plant's reserve pool, and use water purification equipment to treat these sewage.

The treated sewage is injected into the reservoir to increase the water storage capacity of the reservoir.

In addition, it is also planned to carry out preliminary transformation of the sewage discharge system in nearby townships and transport the sewage to the tap water plant.

According to calculations, if the plan goes well, the Qinzhou Water Plant can process 30,000 to 80,000 cubic meters of sewage every day. These treated pure water will greatly supplement the water supply gap.

Before the renovation, the daily water supply of Qinzhou Water Plant was about 50,000 to 60,000 cubic meters.

After the transformation, the water supply can be increased to 80,000 to 90,000 tons per day. The surplus pure water will be injected into the reservoir as preliminary reserve water.

After inspecting the Qinzhou Water Plant, he also went to the Maiji Water Plant. It is temporarily just a small water purification equipment and can only process 20,000 cubic meters per day.

Even a water purification equipment can greatly improve the water quality.

The purified pure water is mixed with the original tap water to neutralize the tap water quality and significantly improve the water quality.

Just as Yang Zhiye was halfway through the inspection, his cell phone suddenly rang.

"Hey, hello!"

"Mr. Yang, there is a problem with pipeline No. 8 in the urban area, and it may be frozen and cracked."

"I'll organize personnel to repair the repair immediately. I'll arrive immediately. I'll send a text message to notify me that the line repair may require a day of water shutdown."
Chapter completed!
Prev Index    Favorite Next