Font
Large
Medium
Small
Night
Prev Index    Favorite Next

Chapter 198 Completion and Open Space

Ning District.

Weizhou Power Plant.

After recent trial run tests, Du Jinhua, along with the engineers of Snail Industry and the engineer team of Huaneng Group, improved and repaired the small problems of the power plant and gas refining plant as much as possible.

Finally, on April 24, the final acceptance work was completed and the Weizhou Power Plant was officially put into use.

In the office building of the power plant, Du Jinhua, Wang Shuo and others, together with local officials, participated in the ribbon cutting ceremony.

After the ribbon cutting ceremony.

Wang Shuo, Du Jinhua and others did not leave the Weizhou Power Plant and killed more than a dozen beach sheep at noon. Everyone held a celebration for the hard work over the past month.

"Mr. Du, I know your regulations. I will give you a bowl of mutton soup." Wang Shuoman picked up half a bowl of mutton soup and drank it.

"Mr. Wang, I respect you too." Du Jinhua drank half a bowl of mutton soup directly.

"Everyone move your chopsticks, don't be polite."

In addition to boiled lamb, there are two roasted whole lamb and scorpions, some naan bread and side dishes.

Du Jinhua was not polite either. He used a knife to cut off a piece of ribs and leg meat on the golden roasted lamb with a small knife, sprinkled a handful of cumin noodles, and ate the roasted lamb in big mouthfuls.

Other engineers cut the roasted lamb directly.

The director of Weizhou Power Plant poured a bowl of soup for Du Jinhua: "Mr. Du, this is an authentic beach sheep. When you go to other places, it is difficult to eat. The beach sheep is boiled in water, which best reflects the original flavor."

"I've eaten it several times." Du Jinhua smiled.

The tall and thin factory manager asked curiously: "Oh, Mr. Du has been to Ning District before?"

After taking a sip of the soup, Du Jinhua explained: "That's not, because Fengmin Agriculture has a breeding industry in this area. There is a beach sheep farm in Jining. I have eaten it several times, but the taste is somewhat different from that here, and it may be a problem of water and soil."

"So that's it, your company has so many industries."

Wang Shuo smiled and said, "Genqiang, Suiren Company is a full-industry chain enterprise, so there is no need to make a fuss."

Since the Suiren Group does not allow employees to gather and drink, Wang Shuo, who has dealt with various subsidiaries of the Suiren Group, naturally will not arrange alcoholic beverages.

The celebration banquet lasted for more than two hours, and everyone who drank and ate enough, except for Wang Shuo, Du Jinhua and others, went down to rest.

The office on the third floor.

While lying halfway down to digest food, he was blowing a fan.

After picking his teeth with a toothpick, Wang Shuo asked about the next arrangement: "Mr. Du, what are your company's plans to do next?"

Du Jinhua, half-closed, thought for a while and replied: "The arrangement of the company headquarters is to let me continue to be in Weizhou. The first batch of solar panels you Huaneng ordered is almost here."

“So fast”

"It's not that I'd like to make solar panel roofs for domestic car companies a few days ago, the board you ordered would have arrived long ago."

After yawning, Wang Shuo spread out the map of Wuzhong City on the desktop and found the location of Weizhou Power Plant and Weizhou Town.

He had a headache because solar farms require a large flat area, and it is best not to cover the surrounding area, and it is best not to be cultivated or on grassland.

But Wuzhong is the Yellow Irrigation District, and the Yellow River runs directly from the central part of Wuzhong. It is the main agricultural, forestry and pastoral area in the south of the Shuhangjiang River, with extremely high land utilization rate.

Although there are quite a few desert areas near Ning District, the distance between the power generation site and the power consumption area will seriously affect the operating cost. Just laying lines and the loss of high-voltage power transmission is not a small amount.

Therefore, Wang Shuo hopes to find suitable areas near Weizhou Town and build a solar power farm nearby.

Du Jinhua, who was lying on the sofa, glanced at the map on the desktop: "Mr. Wang is looking for a venue"

"Yes! The surrounding agricultural areas are too dense, and land acquisition is not worth the cost, so it's a headache!" Wang Shuo patted his forehead.

"Wang is always the one who is in the authorities, and there is actually the most suitable photoelectric field nearby."

Wang Shuo raised his head and looked around Weizhou Town again. He still couldn't see where there was idle. He asked in confusion: "It seems that there is no open space nearby."

"There are four pieces of land nearby, which can be used as the site for the photoelectric field."

"What"

Du Jinhua stood up, pulled out a red ballpoint pen, and circled four positions on the map.

Wang Shuo, who was standing beside him, was stunned. He patted his face: "Why didn't I think that if these places could be used, there would be no shortage of land for the photoelectric field."

The locations circled by Du Jinhua are Weizhou Power Plant itself, the provincial highway at the entrance of the power plant, the nearby abandoned mining area, and the nearby river reservoir.

"If we consider the priority, I suggest building an optical field on the provincial road, with a large area and good infrastructure, and it can be continuously extended."

Wang Shuo thought for a while: "But this matter requires the consent of the highway management department, and the addition of solar panels will affect the lighting of the highway."

"Don't worry, we can raise the height of the solar panels. In the air about ten meters, the astigmatism on both sides can ensure the amount of light during the day."

Wang Shuo nodded: "This is indeed a solution."

Du Jinhua continued: "But building a solar power plant on river reservoirs is actually conducive to reducing the evaporation of water bodies. Our company has tested several reservoirs in Texas and can reduce the evaporation by about 50 to 70%.

Faced with this plan that can win multiple goals in one go, Wang Shuo was also moved. He hurriedly wrote these proposals into specific and detailed plans.

After discussing with Du Jinhua and others, they set the suspended height of the solar panels, the spacing between the panels, and how to prevent strong winds and fall off.

When the specific plan is written, Wang Shuo reported to Huaneng Group headquarters.

The first batch of solar panels transported from Texas has arrived at the Weizhou Power Plant.

Du Jinhua began to prepare for construction. As the first construction area for solar panels, it naturally selected the plant area of ​​the power plant.

All office buildings and factory roofs are used, and 5,000 square meters of solar panels are just a small matter.

The roof of the seventh floor of the office building of Weizhou Power Plant.

The steel structure treated with silicon nano-coating was adjusted to the roof of the stairs by a crane and expanded screws were stamped, and the steel structure was quickly built.

Du Jinhua looked at the construction site and installed a 2-meter x 2-meter solar panel on a steel structure structure, as well as a supporting lumen sensing system, arranged at four corners of the roof.

The lumen sensing system is actually to sense the light intensity of the surrounding environment, and add the data of four points. After combining it, the solar panels can basically follow the direction of direct sunlight in time and achieve maximum power generation by continuously adjusting the rotation direction.

After installing the first solar panel, Du Jinhua started the program of the main control computer.

When the lumen sensing system senses the intensity of the sun's light, the data fed back is calculated by the system to obtain the angle and illumination intensity of the sun's light.

The power generation is also relatively normal. A standard 4-square-meter solar panel can obtain 8 to 10 hours of light in one day, and can generate about 14 degrees of electricity, with an average of about 3.5 degrees of electricity per square meter per day.

With an area of ​​5,000 square meters, it can generate about 17,500 kWh of electricity per day, and it is basically more than enough to supply electrical equipment in the factory.
Chapter completed!
Prev Index    Favorite Next